Panelzapfor ServiceM8

Design, sell, install and certify solar jobs - inside ServiceM8.

Solar paperwork, done right.

Panelzap puts the MCS paper trail, the design checks and the quote where the job already lives: on the ServiceM8 job card. It names the next step on every job, explains each check in plain English, and keeps the certificate paperwork honest, so your first MCS job feels like your fiftieth.

Design

Draw the panels on the roof, draw the horizon on the MCS sunpath chart, and get the MCS 032 performance estimate, a PVGIS cross-check and the rails, clamps and hooks to order. Then string sizing against the inverter window, DC and AC cable checks, wind uplift to MCS 012, roof structure to MIS 3002 Table 1, DNO route, indicative yield. One screen, one button.

Sell

A quote that fills itself from the design and your own defaults, with true margin, VAT suggested, and lines written straight onto the ServiceM8 job.

Install

Eleven stages with the right checklist injected as the job moves. Scaffolding, materials, RAMS, subbies - your workflow, not just the compliance bits.

Certify

The 30-day MCS certificate clock, the 28-day G98 window, the G99 waiting clock, MCS forms F01 to F08, the eleven-document handover pack - with alarm badges set every night.

Works on any ServiceM8 plan with Forms (Growing and above). Standards: MIS 3002:2025 Issue 2.0, MIS 3012, MCS 012 Issue 3.0, MCS 032, BS 7671:2018+A4:2026, PAS 63100:2024. Version 2.0.0 build 2026-11-21 15:27Z. Privacy
Panelzap · build 2026-11-21 15:27Z